Implemented projects Print version

Reference list of locations where SWOCP was implemented by SPE Energetika i Nauka and A. Storozhuk

Description of work Location Year
Development and implementation of SWOCP on P-49 boiler of 500 MWt power unit after replacement of the lower radiating part. Nazarovo State District Power Plant, boiler #7b 2009
Development and implementation of SWOCP according to VGB-R 513 standards on 300 Mwt power unit. Uong Bi Power Plant, Vietnam, power unit #1 2004—2006
Development and implementation of SWOCP after replacement of heating surfaces on NG-230-2 boiler with installation of temperature inserts into furnace waterwalls. Tomsk State District Power Plant 2, boilers #6 and #7 2004—2005
Development and implementation of post-assembly SWOCP on TPE-214 boiler with installation of temperature inserts into furnace waterwalls. Novosibirsk Central Thermal Power Plant 5, boiler #6 2004
Development and implementation of post-assembly SWOCP on E-160-2,4-250 boiler with installation of temperature inserts into furnace waterwalls. Ulan-Ude Central Thermal Power Plant 2, boiler #4 2004
Development of technology and scheme. Implementation of SWOCP on 50 MWt power units is being prepared. Obra Power Plant, India, power units #1—5 2004
Development and implementation of pre-launch SWOCP on TP-10 boiler with installation of temperature inserts into furnace waterwalls. Central Thermal Power Plant CHK, Seversk, boiler #15 2003
Development and implementation of pre-launch SWOCP on BKZ-230/13,8KT boiler. Kazan Central Thermal Power Plant 2, Tatenergo, JSC, boiler #11 2002
Development and implementation of post-assembly SWOCP on BKZ-320-140GN boiler with installation of temperature inserts into furnace waterwalls. Yaroslavl Central Thermal Power Plant 3, boiler #7 2002
Development and implementation of post-assembly SWOCP on BKZ-220-9,8-540G boiler with installation of temperature inserts into furnace waterwalls. Central Thermal Power Plant JSC «Tulachermet», Tula, boiler #8 2002
Development and implementation of post-assembly SWOCP on BKZ-240-100FFZ boiler with installation of temperature inserts into furnace waterwalls. Chita Central Thermal Power Plant 1, boiler #1 2001
Implementation of the Stage-1 of post-assembly SWOCP on BKZ-220-100 boiler. Sarov Central Thermal Power Plant (Arzamas-16), boiler #9 2000
Implementation of post-assembly SWOCP by the staff of Tomsk Central Thermal Power Plant 3 according to the program developed by SPE Energetika i Nauka on BKZ-500-140 boiler. Tomsk Central Thermal Power Plant 3, boiler #2 2000
Development of a working project and implementation of post-assembly SWOCP on TPE-429 boiler.. Ulyanovsk Central Thermal Power Plant 2, boiler #5 1999
Development of working projects of SWOCP in co-operation with GUP VO Technoproject for two BKZ-220-100 boilers. Kastolats-A Thermal Power Plant, Yugoslavia 1999
Development of a working project and implementation of post-assembly SWOCP after acid pickling of furnace waterwalls of TPE-429 boiler with installation of temperature inserts into furnace waterwalls. Ulyanovsk Central Thermal Power Plant 2, boiler #1 1998
Development of a working project with blueprints of temporary pipelines and all elements of the scheme for 210 MWt power unit. Plevlya Thermal Power Plant, Montenegro, SFRYu, power unit #1 1998
Development and implementation of post-assembly SWOCP on KVGM-100 boiler. Achinsk NPZ-VNK 1997
Development and implementation of post-assembly SWOCP on H702 refrigirator of KT 1/1 installation. JSC Omsk NPZ 1996
Development and implementation of post-assembly SWOCP on BKZ-500-140 boiler with verification of intensification of waterwall surfaces cleaning using patent #2064151. Tomsk Central Thermal Power Plant 3, boiler #1 1996
Development of a working project of SWOCP for 500 MWt power unit after the replacement of a heating surface part. Introduction (for the first time ever) of the cleaning of reheater with the reverse of steam-water mixture flow on a working boiler. Reftinsky State District Power Station, power unit #9 1995
Implementation of post-assembly SWOCP on 500 MWt power units. The first usage of patent #2064151 (application of steam-water mixture). Ekibastuz State District Power Station 2, power units #1 and #2 1994—1995
Development of a complex non-waste post-assembly technology of SWOCP for 185 MWt power unit with E-500 CSK boiler and 185/215 turbine. Omsk Central Thermal Power Plant 6, power unit #1 1994
Development and implementation of SWOCP technology, applying intensified cleaning using steam-water medium and changing flow direction for water-heating boilers (KVGM-100 and PTVM-30). Omsk Central Thermal Power Plant 6 1992—1994
Implementation of post-assembly SWOCP on 500 MWt power unit. Ekibastuz State District Power Plant 2, power unit #2 1993
First time ever in the world power engineering a post-assembly SWOCP were implemented by the staff of Ekibastuz State District Power Plant 2 on 500 MWt power unit. Ekibastuz State District Power Plant 2, power unit #2 1991