Description of work
|
Location
|
Year
|
|
Development and implementation of SWOCP on P-49 boiler of 500 MWt power unit after replacement of the lower radiating part.
|
Nazarovo State District Power Plant, boiler #7b
|
2009
|
|
Development and implementation of SWOCP according to VGB-R 513 standards on 300 Mwt power unit.
|
Uong Bi Power Plant, Vietnam, power unit #1
|
20042006
|
|
Development and implementation of SWOCP after replacement of heating surfaces on NG-230-2 boiler with installation of temperature inserts into furnace waterwalls.
|
Tomsk State District Power Plant 2, boilers #6 and #7
|
20042005
|
|
Development and implementation of post-assembly SWOCP on TPE-214 boiler with installation of temperature inserts into furnace waterwalls.
|
Novosibirsk Central Thermal Power Plant 5, boiler #6
|
2004
|
|
Development and implementation of post-assembly SWOCP on E-160-2,4-250 boiler with installation of temperature inserts into furnace waterwalls.
|
Ulan-Ude Central Thermal Power Plant 2, boiler #4
|
2004
|
|
Development of technology and scheme. Implementation of SWOCP on 50 MWt power units is being prepared.
|
Obra Power Plant, India, power units #15
|
2004
|
|
Development and implementation of pre-launch SWOCP on TP-10 boiler with installation of temperature inserts into furnace waterwalls.
|
Central Thermal Power Plant CHK, Seversk, boiler #15
|
2003
|
|
Development and implementation of pre-launch SWOCP on BKZ-230/13,8KT boiler.
|
Kazan Central Thermal Power Plant 2, Tatenergo, JSC, boiler #11
|
2002
|
|
Development and implementation of post-assembly SWOCP on BKZ-320-140GN boiler with installation of temperature inserts into furnace waterwalls.
|
Yaroslavl Central Thermal Power Plant 3, boiler #7
|
2002
|
|
Development and implementation of post-assembly SWOCP on BKZ-220-9,8-540G boiler with installation of temperature inserts into furnace waterwalls.
|
Central Thermal Power Plant JSC «Tulachermet», Tula, boiler #8
|
2002
|
|
Development and implementation of post-assembly SWOCP on BKZ-240-100FFZ boiler with installation of temperature inserts into furnace waterwalls.
|
Chita Central Thermal Power Plant 1, boiler #1
|
2001
|
|
Implementation of the Stage-1 of post-assembly SWOCP on BKZ-220-100 boiler.
|
Sarov Central Thermal Power Plant (Arzamas-16), boiler #9
|
2000
|
|
Implementation of post-assembly SWOCP by the staff of Tomsk Central Thermal Power Plant 3 according to the program developed by SPE Energetika i Nauka on BKZ-500-140 boiler.
|
Tomsk Central Thermal Power Plant 3, boiler #2
|
2000
|
|
Development of a working project and implementation of post-assembly SWOCP on TPE-429 boiler..
|
Ulyanovsk Central Thermal Power Plant 2, boiler #5
|
1999
|
|
Development of working projects of SWOCP in co-operation with GUP VO Technoproject for two BKZ-220-100 boilers.
|
Kastolats-A Thermal Power Plant, Yugoslavia
|
1999
|
|
Development of a working project and implementation of post-assembly SWOCP after acid pickling of furnace waterwalls of TPE-429 boiler with installation of temperature inserts into furnace waterwalls.
|
Ulyanovsk Central Thermal Power Plant 2, boiler #1
|
1998
|
|
Development of a working project with blueprints of temporary pipelines and all elements of the scheme for 210 MWt power unit.
|
Plevlya Thermal Power Plant, Montenegro, SFRYu, power unit #1
|
1998
|
|
Development and implementation of post-assembly SWOCP on KVGM-100 boiler.
|
Achinsk NPZ-VNK
|
1997
|
|
Development and implementation of post-assembly SWOCP on H702 refrigirator of KT 1/1 installation.
|
JSC Omsk NPZ
|
1996
|
|
Development and implementation of post-assembly SWOCP on BKZ-500-140 boiler with verification of intensification of waterwall surfaces cleaning using patent #2064151.
|
Tomsk Central Thermal Power Plant 3, boiler #1
|
1996
|
|
Development of a working project of SWOCP for 500 MWt power unit after the replacement of a heating surface part. Introduction (for the first time ever) of the cleaning of reheater with the reverse of steam-water mixture flow on a working boiler.
|
Reftinsky State District Power Station, power unit #9
|
1995
|
|
Implementation of post-assembly SWOCP on 500 MWt power units. The first usage of patent #2064151 (application of steam-water mixture).
|
Ekibastuz State District Power Station 2, power units #1 and #2
|
19941995
|
|
Development of a complex non-waste post-assembly technology of SWOCP for 185 MWt power unit with E-500 CSK boiler and 185/215 turbine.
|
Omsk Central Thermal Power Plant 6, power unit #1
|
1994
|
|
Development and implementation of SWOCP technology, applying intensified cleaning using steam-water medium and changing flow direction for water-heating boilers (KVGM-100 and PTVM-30).
|
Omsk Central Thermal Power Plant 6
|
19921994
|
|
Implementation of post-assembly SWOCP on 500 MWt power unit.
|
Ekibastuz State District Power Plant 2, power unit #2
|
1993
|
|
First time ever in the world power engineering a post-assembly SWOCP were implemented by the staff of Ekibastuz State District Power Plant 2 on 500 MWt power unit.
|
Ekibastuz State District Power Plant 2, power unit #2
|
1991
|